November 2012: Falmouth Wind Daytime Sound Sampling Study Report

This report is a follow-up to the study that MassDEP provided the Town of Falmouth in May 2012, detailing attended sound sampling results for the nighttime period. This study presents results from daytime sampling of the combined sound from Wind #1 and Wind #2.

Complete report, including cover letter and data appendices:  November 2012 Report pdf format of Falmouth Wind Daytime Sound Sampling Study Report
file size 2MB
 



May 2012: Falmouth Wind Nighttime Sound Sampling Study Report

This report presents the results of attended sound sampling of the wind turbine located at Falmouth's wastewater treatment facility on Service Road in East Falmouth. In September 2011, in response to numerous noise complaints from neighbors, the Town requested that MassDEP conduct sound sampling of its Wind #1 turbine. This sampling augments the unattended sound study conducted by the Town's consultants in Summer 2010.

Complete report, including cover letter and data appendices: May 2012 Report pdf format of MassDEP Sound Sampling Study: Falmouth Wind #1
file size 6MB